SHELVING. SUPPLY. STORE SUPPORT.

Your Shelving Supply Partner for Store Projects

From your first aisle to a complete store. Supermarket shelving and coordinated fixture supply, built around your project.

View Products

Receive your free initial store layout within 72 hours of providing the required project details.

See how the layout service works →
THE FOUNDATION OF YOUR STORE01 / 03
Original concept illustration of a three-bay double-sided supermarket gondola with shelves and uprights
CORE SHELVINGDouble-sided gondolas

PRODUCT CONCEPT · NOT A PRODUCT PHOTO OR VERIFIED CONFIGURATION

Free initial layoutWithin 72 hours of complete details
Manufacturing + sourcingOwn production & partner supply
Project-focused supportConfiguration, packing & quotation

01 / OUR PRODUCT RANGE

The essentials.
For every part of your store.

Start with the shelving. Bring the rest together.
Explore three coordinated shelving families for your project.

Product images are rendered from CAD models. Finishes are illustrative; confirm the selected configuration and supply details in your quotation.

02 / STORE PROJECT SUPPORT

More than shelves.
A plan that fits your business.

Opening a store, fitting out a project or sourcing a range?
Start with the way you buy.

STORE PLANNING STUDY01
PERIMETER DISPLAYMAIN SHELVING AISLESCHECKOUTENTRANCE
Illustrative layout · Not a completed customer project or construction plan

A coordinated plan for the whole store.

Connect your main aisles, perimeter displays, fresh-food area and checkout zone in one clear shelving brief.

  • Product mix & display zones
  • Shelving selection & quantities
  • Coordinated fixture supply

Final circulation, fixing and local safety requirements need project-specific review.

03 / FROM A SPACE TO A STARTING POINT

Your store idea.
A clearer way forward.

Receive your free initial store layout within 72 hours of providing the required project details.

What is included? →
  1. 01

    Tell us about your space

    Share dimensions and units, entrances, fixed obstacles, store type and main merchandise. A sketch or written details is fine.

  2. 02

    Receive your initial layout

    Once the required details are complete, your 72-hour period begins. Review the main display zones and shelving arrangement.

  3. 03

    Move towards a clear quotation

    Discuss the arrangement, confirm the product configuration and quantities, then move to a tailored quotation.

04 / MANUFACTURING & SUPPLY

Confidence comes
from the details.

Own manufacturing and partner-factory supply.
A clear picture of what is supplied, by whom,
and what needs to be confirmed.

Manufacturing

Own-production and partner-supply ranges, with the source and responsibility identified.

PROTOTYPE · MATERIALS TO ADDFactory photographs & range ownership

Quality checks

Product-specific specifications and inspection information to support configuration decisions.

PROTOTYPE · MATERIALS TO ADDInspection records & approved specifications

Packing & delivery

Packing details and transport requirements reviewed against the actual order and destination.

PROTOTYPE · MATERIALS TO ADDPacking photos, measurements & loading records

05 / BEFORE WE GET STARTED

A few practical
questions.

Know exactly what comes next.

What is included in the free store layout?

An initial shelving arrangement covering the main display zones and configurations to review. It is not an architectural, structural, fire-safety or permit design. The presentation format and any further design work are discussed for your project.

When does the 72-hour period start?

The 72 consecutive hours begin when the required project details are complete: store dimensions and units, entrances and fixed obstacles, store type and main merchandise, and valid contact details. A professional CAD drawing is not required; a dimensioned sketch or complete written details can be used.

Can I request a quote without a store layout?

Yes. If you know what you need, use Request a Quote and share the product types, quantities and destination country and city. Unknown details can be clarified during the quotation process.

Do you manufacture every product yourselves?

GONDORACK combines own manufacturing with coordinated supply from partner factories. The manufacturing source and responsibility for each product range will be clarified with the confirmed product information.

What are your minimum order quantities and lead times?

There is no minimum order quantity for our GR80C shelving range. Typical lead time is 15–25 days; the final schedule is confirmed against your configuration, quantity and delivery requirements.

How are specifications, packing and freight confirmed?

Dimensions, material and load claims require approved product information. Packing and freight are quoted against the final configuration, quantities and destination. A port is not required if your project uses a road or rail destination.

LET’S START WITH YOUR STORE

Bring your space.
We’ll help plan the shelves.

Free initial layout within 72 hours of complete project details.

LET’S PLAN YOUR NEXT STEP

How can we help?

Start with a store plan, or bring us a product list.

Foshan Gondorack Co., Ltd

No. 1 Chaogui South Road, Foshan City, Guangdong Province, China
Email: shelf@gondorack.comWhatsApp: +8613727380854
Back to top ↑
YOUR STORE, YOUR NEXT STEP

Get a Free Store Layout

Receive your free initial store layout within 72 hours of providing the required project details.

Demo only — nothing will be sent. Please use sample details. No data is uploaded or saved after refresh.

For the 72-hour layout: include dimensions, entrances, fixed obstacles and main merchandise. A sketch or written details is enough; missing information can be clarified.

PRODUCT FAMILY PREVIEW
Product concept

Concept illustration only. Real photographs, specifications, available options and supply source are pending factory confirmation.